+91-9873379062 | info@oindc.com
ZED

Rapid ZED Bronze & Silver Certification Readiness

Guided an engineering enterprise through 5S workplace organization, energy parameters, and desktop upload criteria for ZED certification.

Industry: Engineering
Location: Gurugram, Haryana
Rapid ZED Bronze & Silver Certification Readiness

The Challenge

Enterprise required ZED certification to unlock state subsidies and onboard as a qualified vendor for major OEMs but lacked structured evidence documentation.

OINDC Approach

Deployed OINDC's ZED DIY framework, optimized shopfloor layout, executed 5S workplace transformation, and streamlined energy and quality documentation for direct portal upload.

Measurable Outcomes

Successfully awarded ZED Bronze status on first submission within 40 days, unlocking subsidy benefits.
Case Study Disclosure: Client names, financial data, and specific production parameters are published only with appropriate client permission. Where unavailable, anonymized industry descriptions are used.